News

The high-pressure core project is expected to reach a technology readiness level (TRL) of 5 by early 2024 and reach the pre-full-scale development TRL 6 level by the end of 2025.
Pressure in the service module dropped on July 29, the day the Nauka research module docked, to about one third of its level on July 14 but would be increased, Rogozin tweeted.
ARB has released its Pressure Control Module, a hands-free device that eliminates the need to squat and squint at your manual tire pressure gauge while adjusting the air pressure in your vehicle's ...
The head of Russia's Roscosmos space agency said on Saturday that pressure in a Russian service module on the International Space Station had dropped as a result of an air leak.
That was a design that worked very well, for a very long time, after all. The core module's readiness was announced by China Manned Space (CMS), which also showed a video of the module being prepped.
The Base Block, or Core Module, is the heart of Mir. First launched into orbit in 1986, it comprised the entire space station for over a year, before the other modules were launched. Built of two ...